Provided design for a replacement plant for the Tallahassee Memorial Healthcare (TMH) Campus. Included design of a new primary chilled water loop, secondary chilled water loop, and addition of 4,500-tons of cooling tower located above the existing chiller and boiler plants. System made corrections to existing chilled water campus loops, in particular the ER air conditioning systems. Added (2) 1 Megawatt generators and (1) 1.5-Megawatt generator for the Mustian Surgery Tower Addition. Total chilled water capacity added to the campus was 4,500-tons. Because of changes to the systems, TMH was able to turn off (5) chilled water pumps and operate on new pumps with proper loop water pressure and flow control.